Translate

Monday, August 26, 2013

Rest Ahoused

We have been in a frantic, headlong rush to complete as much of the restoration as possible  before the first volunteer/intern arrives Wednesday night. Necessity hastens.

The interior bedroom was the first priority. We painted the floor a terracotta color and unpacked even our long-packed luggages into the dresser. The two nights since have been quiet and peaceful in a way completely opposite of nights in Ana Lucia's house across from the karaoke bar.

Next was to complete the netting around the Veranda and install the outdoor kitchen area, comprised of preparation spaces, a sink and an oven with built-in stovetop. We ran out of assembly pieces -- nails, bolts, wall plugs, etc. -- and will be heading to Ibarra in a few hours for a small shopping trip.

Meanwhile, now that the evening drive has been eliminated and we can sit down to discuss our ideas for the house we have finally had time to prepare a small model, more or less to scale. Here it is:

View of the bedroom, lounge, kitchenette, storage room and entrance -- facing south.

View of yoga room with human figurine for scale. Figurine represents a height of roughly 5'8" (172 cm). Yoga room is on a lower level than rest of house.

View of lounge with human figurine for scale. Lounge is also on a lower level.

Top view of house. North is the top of the plywood sheet, where the bedroom is. Yoga room to the east, entrance and storage to the south, lounge to the west.
View of entrance with human figurine for scale.

View of kitchenette with human figurine for scale.

No comments:

Post a Comment